Restoration of Strumica River Basin

Project summary

The overall objective of this project is to introduce a set of comprehensive measures that will help restore Strumica River Basin’s socio-ecological functions and its overall resilience against the complex pressures resulting from human activities and global changes. Aligned with the key principles of the EU Water Framework and Floods Directives and the underlying concept of Integrated Water Resources Management, this project aims at addressing the main types of pressures in the Basin (point source and diffuse pollution, as well as hydro-morphological modifications), maximizing at the same time the possibilities for mitigating flooding risk.

Activities:

This six-years project aims to bring significant positive environmental effects, but it will also support livelihoods by introducing better resource management practices and increasing the resilience of communities to water-related risks.

Results:

1. Reduced pressures on water bodies and enhanced resilience of the Strumica River Basin to the flooding hazards;

2. Strengthened municipal capacities for environmental permitting by introducing the principles of integrated pollution prevention and control;

3. Support to the municipalities in identifying the most feasible wastewater management approaches;

4. Piloting small-scale decentralized wastewater treatment system in selected rural communities;

5. Reduced use of agrochemicals and modified irrigation practices to reduce agricultural runoff and to ensure more sustainable use of water resources;

6. Basin-scale analysis of flood risk and identification of feasible short- and long-term (systemic) flood risk mitigation options;

7. Optimized operating regimes of the existing reservoirs and other water structures and introduced flood early warning system;

8. Strengthened legal and regulatory environment for integrated flood risk management.

Status:

Ongoing

Project start date:

July 2015

Estimated end date:

December 2020

Focus area:

  • eradicate poverty in all its forms and dimensions
  • inclusive growth
  • Project office:

    UNDP in North Macedonia

    Implementing partner:

    Ministry Env&Physical Planning

    Full project information  

    Funding Support by

    Donor name

  • United Nations Development Pro
  • Government Of Switzerland
  • Amount contributed

    $3,119,540

    Delivery in previous fiscal year

    2019 $179,444

    2018 $453,496

    2017 $940,968

    2016 $485,518

    2015 $409,727

    2014 $110,384